Thursday 9 October 2014

Filling in the blanks... part uno

I am going to use the next couple of blogs to fill in some of the blanks I missed to write about when we were in the throws of the finishing the house off. We simply didn't have enough time to write properly, but I made some notes and took some photos along the way so I could come back to it later (well now really).

The first of the missing blogs is June 2014. We started to make some progress downstairs that made it feel more like a house than a shell. With the electrics and plumbing first fix sorted, the tiles on the floor we were able to fit the kitchen and the delay in the floor tiles meant that we were able to use the time for Stan Stones to tile the shower room. I fitted most of the kitchen myself, very therapeutic when it goes to plan...

The kitchen has finally been moved into the right part of the house, while we start to assemble units before moving them out of the way to start fitting the units.
 The first and most difficult unit on the who kitchen is put into position and fixed
 Washing machine & dishwasher spaced as the other units go in
We have the bare bones of a kitchen
 The shower room tiling is well under way, with the glass tiles forming the back wall of the shower
Holes in the wall, sealed and tiled
Tiles grouted and ready for the shower, screen, toilet and sink
While the downstairs moves on, Fliss and Mum wallpapered Josh' bedroom

Thanks, for reading the next blog will be soon!