Sunday, 6 April 2014

Preparing for plasterboard

Well it's been nearly 5 weeks since the last blog and this has been a result of slower progress on the build as things are being are being tidied up prior to plasterboarding and also being very busy coming towards the end of financial year in work (www.oldfieldsgarage.co.uk). I've also been back to the 90's on a friends Stag do. We also visited the Homebuilding & renovating show at the NEC last weekend, but I will write about that in another blog - some interesting ideas gained (some we wish we thought about earlier) and we've also found a few finishing products.

The slower progress I've just mentioned however, might not be as slow as I thought because I've just scanned through the last blog photos and actually we have done quite a bit (it has just felt slow).

We are very pleased with how level the screed finish is - which is exactly what we were hoping to achieve! It still won't be completely dry, but you wouldn't know from the how it feels on the top.

The external weatherboarding is completely finished - and we love it.I did underestimate the number of board slightly and we were 3 boards short. Fortunately because we used a local supplier (Powell & Co, Kingsland) we got it delivered as we needed it so it didn't hold us up. The only downside is that it isn't painted so we'll need to do this when we touch up the rest of the boards.


 Weatherboarding finished!
Oops a few boards short

We've also had the handles fitted on the windows and doors - again we are very happy with the look of them. The only drawback is that fitting the handles has uncovered a problem with some of the handles catching the frames (but this is going to be resolved middle of next month and then they'll be re-finished to rectify the paint finish issues straight after).

 Pewter door handles
Matching window furniture

In the last few weeks we've started and completed the insulation downstairs (a lot easier than the roof, which still isn't quite done) and it's now ready for the vapour barrier to be fitted. We've again used 100mm Kingspan Kooltherm, with the exception of a few areas where wiring made that difficult to get a good coverage and we've used Knauf frame insulation. Wherever possible we've topped the Knauf with  40mm Kingspan Kooltherm - it might be a bit over the top but as I've said before we aren't planning on ever moving so don't want to skimp on insulation.

If me doing any work makes it on't telly those 4 panels were what I was doing when it was filmed - anyone would think I saved some easy ones for filming purposes??!


My workshop by night

We've also taken delivery of the kitchen, not ideal timing - it either means we're a little bit behind where I thought we would be now or I was a little over enthusiastic on timescales! We'll need to work around it until the plasterboard is done, which isn't perfect (but at least a delay isn't going to hold us up when we need it I suppose?!). The kitchen delivery man told me "our house looks sick" which is a positive!

Kitchen in the bedroom

We've got the plasterboarding and drylining scheduled for the fortnight from 28th April, so just need to finish the insulation upstairs (I've left the worst bits until last), make sure all the noggins are in place ready for plasterboard and anything we need a good fixing for on the walls (like wall mounted TVs). We've also got to fit the sound deadening between the floors and in the stud walls. The stairs are due to be fitted on the 10th May - which is really exciting as well.

In the next week though the internal brick wall will be built, we've loaded the bricks out ready to go and we'll also have the plumber doing the final bits of first fix. We are also starting to organise the external waste/drainage and a bit more moving soil around in the garden. 

Monday, 24 February 2014

Windows, doors, boards, heating, screed, more insulation and paint

It's been 2 weeks since my last blog and there has been some pretty big changes in that time. 

We've now got windows and doors fitted (albeit with some paint issues, but I'll explain that later), the weather boarding preparation has started (and a few boards are on), our paint factory has been de-commissioned after the 2nd coat of paint on the boards being complete (with most of them stacked around the outside of the house ready to go on). First fix electrics are done (barring a couple of little bits now the boards are out of the way), we are awaiting the next delivery for Kingspan Kooltherm Insulation for the floor and walls, we have confirmed a date for the underfloor heating to be installed and also for the flowing screed to go on top of it. 


Windows and doors installed!!
A view from the inside
It's hard to believe that the weather during the 3 days prior to this picture whilst the windows and doors were being fitted was awful - wind & rain!

Fliss and I are both delighted with the windows and doors, we're just waiting for the pewter handles to finish them off. The colouring against the Oak, bricks, tiles and the weatherboard is exactly what we were hoping it would look like when we were planning! The delight of them going in has been a little muted because of an issue with the paint finish on them. We ordered pre finished timber windows so we didn't have anything to do on them once they were installed, but there are patches on all the windows which are lighter grey to what they should be. Whilst it is disappointing the resolution has been quickly dealt with and they are going to be re-painted on site.

We had a visit from my niece on the weekend, it was only right she helped out with a bit of sweeping up... it only cost me a packet of buttons! A fair swap I thought as the minimum wage isn't applicable?

Fliss finally gets the saw out to help with some insulation...

As I mentioned all the boards are now painted with 2 coats, which means that we should only have to do a little bit of touching up once they are on the house. It has amazed me as to the amount of preparation required before the boarding even started. Damp proof course was used to close the brick cavity, lead has been dressed around the top and bottom of all windows and doors, timber finishing to frame the windows were fixed, lead has been dressed on the top of the brick work and batten was put on - before it even got close to putting boards on. Upright finishers on the corners and end of boards around doors and then to boarding could start to go on.
Corner posts, lead dressing, window finish frame and first weather board on
Batten and blue skies
Normal skies resume...

This week we've got our next Kingspan delivery coming and we've got the architect coming to do his next certification visit. The under floor heating in being installed early 4th & 5th of March, which gives me just over a week to put the insulation in the floor and the DPC on top so the pipes can go on. Luckily it looks a lot easier than the roof so we should be fine for time... famous last words!

Finally we have decided to go with Flowing screed through Acorn Construction rather than semi dry. It is a bit more expensive, but it has better thermal value for the underfloor heating and it will also have a smoother (more level) finish. I'll come back to that once it has been done!

Thanks for reading, Tim