Monday, 7 October 2013

Ahh, but this tape measure is different... and rain could have caused a disaster.

Slightly behind schedule on the blog, but fortunately the same doesn't apply for the build! 

I'll start off with one of the issues we had! So far throughout the build we've moved a lot of soil, neatly tumped down the bottom of the garden... or so I thought. We've put Gabions filled with stone to retain the soil, which isn't a problem however a prolonged day of rain; and more rain on Thursday caused the soil banked near the hedge to shift and the consequence was the hedge collapsing... into the road! This could have been a big problem, but after a bit of good patch up work from Mum and my brother (who were the first responders in this case) to tie the hedge back, we trimmed it back temporarily and MGL managed to get Pete back on site (Pete helped with the digger work on the foundations) and he moved the soil away from the road edge of the plot. Disaster averted, thankfully. 

Now to look at some more positive activity! Last week saw the completion of the block and brick work to damp proof course level. This means we are officially out of the ground in just under two weeks! 


Base with damp proof membrane ready for the concrete slab

We've got the concrete slab being poured on Wednesday this week, which means we are ahead of schedule and managed to do so even with a few days of poor weather (sorry about that Mark)! Pretty much all of our base works products have been ordered through Travis Perkins, Leominster. I don't know if all depots are the same but they have been knowledgeable, very helpful throughout and everything has been delivered on time, when they said, with little fuss. I can't stress enough the importance of this in assisting with getting the base done quickly. 

Once the concrete is poured we'll be ready for Border Oak with the frame! We've ordered the roof windows from Travis Perkins and they will store them for us until we need them. We are a bit ahead of where we thought we'd be at this stage, because the frame isn't due to go through the Border Oak workshops for another couple of weeks. I'll keep you posted on this. 

After the rain, I've bitten the bullet and purchased myself some rigger boots - I've always fancied a pair and now I have a legitimate reason for them and at least I look the part!


They're dirty now, honest

This weekend saw Fliss and I visit Grand Designs Live at the NEC. with the aim of finding inspiration for some of the finishes and also potential suppliers. In a word PACKED. Lots of shuffling to move through the crowds, but was great to find some inspiration, some affordable some well out of our budget. 

A couple of neat products we found were, pocket doors for the upstairs bathroom (I'll re-visit this at a later date), some interesting stone finishing products and there was flooring options galore. We're also seriously considering a Heat Recovery Ventilation System. It isn't something we have budgeted for, but if was can make the numbers work it might not be as expensive as we first thought. For those that don't know what this is, basically it is a way of keeping fresh air in the building. It does this by extracting air and moisture from the inside of the house, and replacing it fresh air, that is not cold because of the way the extraction system works (using an energy cell). There are lots of variations of the system (this is a very simple description). You'd need to ask experts in these systems for more detailed information. We have a few things to work through before deciding whether it will work for us (like where to put the main unit) and how to go about it, but it is something we are seriously thinking about. 

We also took the opportunity to chat with one of the #AskAnExpert team and we're mulling over what to do with the information provided.


Now did I mention a tape measure? We'll if you've read other blog entries, you may think I have an obsession for tape measures...  I would argue that it is simply an essential building tool. Yes I did buy another tape, but this one was different... it is a double sided 2 in 1 gap tape! What more could you want when measuring a gap!


Thanks for reading, Tim

Follow us on Twitter www.twitter.com/fortyacresbuild

PS I've added a subscribe section on the top right of this blog to make it easier to follow the build. 


Saturday, 21 September 2013

Note to self: lights on in a caravan at this time of the year only means one thing...

...daddy-longlegs will invade!

With the exception of some soil being taken away as mentioned last week, my main physical activity this week has been removing daddy-longlegs from the caravan - there have been loads! It's been quite while since we lived in an actual house now, but I don't remember it being this bad before. Needless to say, I won't be leaving doors open and lights on in the evenings on any more! One thing that is useful to know though is that there is a common myth that they are highly poisonous but cannot bite humans, according to the University of California this isn't true...


With a big week looming, over the course of the weekend, I have mostly been me looking up at the sky and checking the weather forecast every hour, hoping that the weather will be dry for next week! The forecast is good, so we'll have to wait and see! While there hasn't been too much visible activity this week, there has been quite a lot that has been sorted and organised.

We've ordered the bricks from Travis Perkins ready to build the lower part of the building, to sit the frame onto. I wasn't too sure what time this needed to be done, but MGL builders have really helped to prioritise what to do and when. It's a god job too, because there is a local shortage of bricks and blocks - something I wouldn't have even thought could have been a problem. I am not sure if this is right or not, but I am lead to believe this is because of the regeneration of the old Hereford Cattle Market site. I don't think it will pose a problem for us, but it is another thing I would have expected to be very straight forward. 

We also managed to finalize insulation. It won't come as too much of a shock to those of you who are from Herefordshire, but we have chosen to use Kingspan Insulation. As I have said previously, wherever feasibly possible we will try to use local products/suppliers/trades and with Kingspan Insulation based just down the road in Pembridge, they were always on our wish list of products we would have preferred to use. That said, we looked at lots of options before deciding to go with them because with our limited budget and limited (but ever expanding) knowledge & understanding, we couldn't afford not to check and compare. When you add in the fact that due to an oversight on my part, I hadn't properly priced insulation as part of our original budget plan (we have a contingency built in to the plan, but insulation shouldn't be something that is a contingency)!!! With the budgeting we have tried to allow for worst case scenarios, but we might have had a real problem that could have held up progress and our budgets may have been seriously affected.

The Kingspan website, http://www.kingspaninsulation.co.uk contains a wealth of information regarding product options, properties & performance values and we utilised their technical expertise in planning what to use to give us the most suitable insulation solution. Using there recommendations along with some original suggestions by Jim Hicks/Border Oak, we have decided to go with the Kooltherm products. For the floor we will be using the K3 Floor insulation, to insulate the walls we will be using 100mm K12 Timber frame Insulation along with 37.5mm K18 Insulated plasterboard. For the roof, we will be using K7 Pitched roof insulation. We don't ever intend moving from Forty Acres, so long term planning is an important part of our decision making. Combining the Kingspan products will mean that the building will be very efficient, helping keep the long-term energy costs down.



I have spoken to several local companies this week to make preliminary enquiries about the stairs. We have a wish list, but depending on how the budget stretches we may need to make compromises with this one. We are also hoping this week to tie up our choice on roof light suppliers. 

Both Fliss & I are off work next week, which coincides perfectly for the start. We've got quite a lot we want to look at and MGL will be here Monday to make a start.This week will definitely be a BIG one for us!!!! By the end of the week we should have foundations in place. I can't wait to see that first digger bucket enter the ground as the foundations are started.

Weather permitting, by the next Blog installment we will have some visible progress!